Friday, May 14, 2010

over head crane


We are engaged in providing precision engineered range of Over Head Cranes, which has box like constructed structure, connected with bridge trolley that moves by motors connected to speed reducers. The structure of these cranes is proficiently designed & strengthens by tough & stiff ribs. It is equipped with crab carriage, which placed in the steel section consisting of special high duty motors paired with speed reducers & attached to a steel drum.

Features

  • These industrial overhead cranes are forked revolving hooks made up of forged steel in the block

  • The wire rope used is of 6 x 37 constructions

  • The independent push button control unit controls the entire electric operation

  • Accident free cross & lifting operation is ensured by the limit switches


No comments:

Post a Comment